<p id="9f1fh"><del id="9f1fh"></del></p><pre id="9f1fh"><del id="9f1fh"><dfn id="9f1fh"></dfn></del></pre>
      <p id="9f1fh"></p>
        <pre id="9f1fh"></pre>
          <pre id="9f1fh"><del id="9f1fh"><thead id="9f1fh"></thead></del></pre>
          <ruby id="9f1fh"></ruby><pre id="9f1fh"><b id="9f1fh"><thead id="9f1fh"></thead></b></pre>

              你现在的位置:首页>企业动态>

              双组份打胶机安装的顺序是怎样的?

              浏览:
              1、双组份打胶机设备应安装在干燥、无粉尘、无腐蚀性气体的坏境中(该要求与其他设备一致,当然如果条件达不到至少争取无腐蚀性气体,毕竟设备中有电线以及管路这些配件抗腐蚀性不高)。
              1. The two-component glue applicator equipment shall be installed in a dry, dust-free and corrosive gas free environment (this requirement is consistent with other equipment. Of course, if the conditions are not met, at least strive for no corrosive gas. After all, there are wires and pipelines in the equipment, and the corrosion resistance of these accessories is not high).
              2、室内温度更好控制在10~40度的室内坚硬地面上,地面应水平度要好。(小编这里说的地面水平度要好不一定要非常的平整才行,我们的设备在设计之初已经考虑到了地面复杂性的因素所以对地面平整度是有相当大的忍让度的,只要不是幅度提别的大一般都可以正常工作。)
              2. The indoor temperature should be better controlled on the indoor hard ground of 10 ~ 40 degrees, and the ground should be better leveled. (the ground levelness mentioned here must be very flat. At the beginning of the design, our equipment has taken into account the complexity of the ground, so we have a considerable tolerance for the ground levelness. As long as the range is not increased, it can generally work normally.)
              3、双组份打胶机安装之前,应先检查是否有因运输、搬动造成的变形、损坏和紧固件松动情况,之前就曾经有客户在移动打胶机的过程中把设备的智能控制系统的一个零部件碰掉了而导致设备无法正常运行,我们的工作人员到现场后才排查出的原因。
              3. Before installing the two-component glue applicator, we should first check whether there is deformation, damage and fastener looseness caused by transportation and moving. Previously, a customer knocked off a part of the intelligent control system of the equipment in the process of moving the glue applicator, which led to the failure of the equipment to operate normally. Our staff found out the reason after arriving at the site.
              4、首先我们可以根据地面平整度的实际情况来通过调整设备的可升降地脚螺栓来调整设备的水平度直到设备水平而稳固。然后按图接线并可靠接地,把气源接入机器所配带的气源接口,确保无漏气现象。
              4. Firstly, we can adjust the levelness of the equipment by adjusting the lifting anchor bolts of the equipment according to the actual situation of the ground flatness until the equipment is horizontal and stable. Then connect the wiring according to the diagram and reliably ground, and connect the air source to the air source interface equipped with the machine to ensure no air leakage.
              5、向油槽中加注液压油至指定位置,46#液压油(约为50升左右)。
              5. Fill the oil tank with hydraulic oil to the specified position, 46# hydraulic oil (about 50 liters).
              6、接通电源并打开查看设备是否能够正常运行。
              6. Turn on the power and turn it on to see if the device can operate normally.

              上一篇:封边机在日常使用过程中如何维护及保养?
              下一篇:压盘泵是干什么用的?

              • 官方微信
              99热99
              <p id="9f1fh"><del id="9f1fh"></del></p><pre id="9f1fh"><del id="9f1fh"><dfn id="9f1fh"></dfn></del></pre>
                  <p id="9f1fh"></p>
                    <pre id="9f1fh"></pre>
                      <pre id="9f1fh"><del id="9f1fh"><thead id="9f1fh"></thead></del></pre>
                      <ruby id="9f1fh"></ruby><pre id="9f1fh"><b id="9f1fh"><thead id="9f1fh"></thead></b></pre>

                          好吊色永久免费视频|kik261 国产激情一区二区三区在线|i5i397 特别黄的视频免费播放|iii353 一本一本大道香蕉久在线精品|3ki926 变态另类一区二区三区不卡|iim160 好男人www视频在线观看2019|4ki552 99久久免费视频播放99|im4201 99这里只有精品国产|mmi206 亚洲人成在线播放网站|k4i270 黄色电影网址|mmm711 亚洲人成在线观看|4ik953 日本无吗高清免费|kk4224 免费黄色网址|im4304 免费人成在线播放视频|kmk947 国产在线观看|i3k626 婷婷午夜天|iik108 日韩中文字幕|3ki453 国内自拍视频在线|im3317 国内自拍视频在线|kmk240 99热这里只有精品2|i3k512 99热这里只有精品2|kkk803 99这里只有精品国产|3ki945 久久综合久久综合|ii4869 国产在线拍揄自揄视精品|iik788 这里只有精品在线视频|k4i733 久久精品视频免费|m2i68 亚洲综人网国产|kkm449 国产亚洲亚洲精品视频|2mm382 热99在线视频精品|mm2138 婷婷丁香五月|ikm913 精品无人区麻豆乱码1区2区|i2m221 国产精品自产拍在线观看网站|kik17